Cost / Piece Price

Die casting cost: what actually moves the price per part

Die casting cost is not a number per kilogram: it is a tool, a shot weight, a cycle, a set of machined faces and a packing decision — and each line moves on its own.

Die cast aluminum bracket with machined faces Piece-price review
Tooling
Separate line
As-cast
±0.05 mm
Machined
±0.01 mm
Quote lines
Six

In one sentence

The piece price is a sum: tooling amortisation, shot weight, casting cycle, machined content, finishing and packing — and a price per kilogram only shows the second one.

01 / Why not per kg

Why is there no die casting cost per kilogram?

The alloy is a commodity, so buyers often ask for a rate per kilogram and multiply by part weight. That number misses most of the cost. A 300 g bracket with two machined bores and a sealing face can cost two to three times a 300 g cover that leaves the die and goes straight into a box.

  • Part weight is not shot weight. Runners, overflows and biscuit are cast with every shot; the metal is recovered, but the furnace, the energy and the cycle are still paid for.
  • Yield is part of the price. A stable process at 97% yield can be cheaper per good part than a lower quote at 90% yield.
  • Machining is invisible in a per-kg rate. Each face, bore and datum adds an operation, a fixture and cycle time.
  • Finishing and packing are separate skills. Powder coating, anodizing, plating and export packing have their own cost drivers.

Capacity across the network is 500,000+ parts per month on 20+ machines from 160 to 800 T — a capacity figure, not a reservation for a single order.

02 / The quotation

What are the six lines in a die casting quotation?

A quotation that shows one number cannot be compared with another one-number quote. Ask for the six lines and the assumptions behind each. The freight line depends on the term, which the delivery and Incoterms page sets out.

LineWhat drives itWhat to ask
ToolingCavity count, slides, inserts, cooling layout, expected volumeOwnership, maintenance and transfer terms
Material and shot weightAlloy grade, part weight, runner and overflow weight, scrap recoveryAlloy grade and calculated shot weight
CastingMachine tonnage, cycle time, cavities, yieldTonnage, cycle time and assumed yield
MachiningNumber of faces and bores, tolerance, datums, fixturesWhich features are machined and why
Finishing and packingPowder coat, anodizing, plating, masking, export packingPrice per finish and masking cost
Freight and termFOB, CIF or DDP, volume, destinationNamed place and quote validity
A quote without a tooling line and a yield assumption is a budget, not an offer.
The six lines in a die casting quotation: tooling, material and shot weight, casting, machining, finishing and packing, freight and Incoterm, each with its own assumption.
A one-number quote cannot be compared with another one-number quote. The six lines are tooling, material and shot weight, casting, machining, finishing and packing, and freight and term; asking for all six, with the yield and cycle time behind each, is what turns a budget into an offer.
03 / Worked example

What does a 320 g A380 cover cost at 50,000 a year?

One part, one volume, six lines, every assumption written down. The figures are 2026 planning numbers for a two-cavity aluminum cover — they show how the arithmetic works, not what your part will cost.

AssumptionValue usedWhy it is on the sheet
Finished part320 g, A380, as-cast ±0.05 mmSets shot weight, machining content and finishing
Shot weight520 g, a 61.5% yieldRunner, overflow and biscuit are cast on every cycle
Machine and cycle400 T cold chamber, 45 s, two cavities160 good parts per hour at 97% yield
Cell rate$32/h including operator, energy and overheadThe casting line in the quotation
Machining2.4 min per part on two faces and two bores at $25/hOne fixture, one setup
AlloyA380 ingot $2.35/kg, 2% melt loss, scrap credited at $1.60/kgMetal is recovered; heat, labor and cycle are not
ToolingTwo cavities, two slides, H13, 15–25 days, $42,000One-time, invoiced separately from the piece price
Finishing and packingConversion coat $0.18, export carton $0.06Per part, after inspection

With those assumptions the six lines resolve to the numbers below. Only the material line needs the arithmetic shown; the rest are rate divided by output, or minutes multiplied by a rate.

LineThis partHow it was calculated
Tooling$42,000, one-offTwo cavities, two slides, H13; not part of the piece price
Material and shot weight$0.930.52 kg × $2.35 × 1.02 = $1.25, less 0.20 kg of runner × $1.60 = $0.32
Casting$0.20$32/h ÷ 160 parts/h
Machining$1.002.4 min × $25/h
Finishing and packing$0.24$0.18 conversion coat + $0.06 carton
Freight and termFOB Shenzhen in the price; DDP quoted per shipmentThe named place decides who pays freight, insurance and duty
Piece price, ex-tooling$2.37The five recurring lines above
Tooling per part at 50,000$0.84$42,000 ÷ 50,000
Unit price at this volume$3.21$10.0 per kg of finished part, against $2.35/kg for the alloy

Volume is the only line that changes without touching the part. The same drawing, quoted at three annual quantities on the same two-cavity tool, gives three different unit prices:

Line10,000 a year50,000 a year200,000 a year
Material, net of scrap$0.93$0.93$0.93
Casting$0.20$0.20$0.20
Machining$1.00$1.00$1.00
Finishing and packing$0.24$0.24$0.24
Piece price, ex-tooling$2.37$2.37$2.37
Tooling per part$4.20$0.84$0.21
Unit price$6.57$3.21$2.58
Price per kg$20.5$10.0$8.1

The same arithmetic shows why a design change is worth more than a discount conversation. These are the five levers that move this part, in the order they usually pay:

ChangeEffect on this partWhy
Yield 61.5% → 70%−$0.05Less metal circulates per good part; the heat and cycle stay the same
Machining 2.4 → 1.5 min−$0.380.9 min at $25/h, usually a datum or a tolerance moved to the casting
One more machined face+$0.330.8 min plus a fixture location
Powder coat instead of conversion coat+$0.35–0.60Masking, racking, cure and a second inspection
Four cavities instead of two at 50,000+$0.49 nowTooling +$26,000 (+$0.52/part) against $0.03 of casting; it only pays at several hundred thousand parts a year

These are planning numbers, not a price list. Alloy price moves monthly, machining minutes come from the drawing, and freight depends on the Incoterm. A quotation replaces every assumption above with a measured value for your part, and states the yield and cycle time it used — a piece price without those two numbers cannot be compared with another.

04 / Volume

How does annual volume change the unit price?

Tooling is a fixed cost. The same tool quoted at 5,000 pieces a year and at 50,000 pieces a year carries a different unit price, because the tool is spread over ten times as many parts. That is arithmetic, not a discount.

  • Cavity count is a volume decision. A two-cavity tool costs more upfront and roughly halves machine time per part; below a few thousand pieces a year it rarely pays back.
  • Below roughly 2,000 pieces a year, sand casting or machining from billet can be cheaper once tooling is included — see die casting vs sand casting.
  • Order cadence matters too. One container a quarter and one a week are different production-planning problems, and the second one usually gets a better piece price.
05 / Machining

How much does machining add to the piece price?

As-cast features are quoted at ±0.05 mm for the feature classes where that is realistic. Machined features are quoted at ±0.01 mm, and each one adds an operation, a fixture and cycle time to the quote.

  • Machining allowance is typically 0.3–0.5 mm per surface; more stock means more passes and more cycle time.
  • Datum strategy decides cost. A part designed around two stable datums needs one fixture; a part with datums on opposite faces needs two setups.
  • On precision parts, machining can exceed the casting cost. That is normal; the mistake is discovering it after the drawing is frozen.

The datum strategy guide covers how fixtures and datums interact.

06 / Design levers

Which design changes lower the piece price?

Cost is designed before it is quoted. These are the levers that usually move a price without touching the function of the part.

  • Uniform wall thickness — typically 1.0–1.5 mm in aluminum and 0.6–1.2 mm in zinc. Thick sections add weight, cycle time and porosity risk.
  • Ribs instead of thick bosses keep stiffness while removing metal.
  • Draft of 1–3° on walls and 0.5° minimum on deep walls; insufficient draft causes drag marks and rework.
  • No undercuts unless they earn their place — every slide adds tool cost and maintenance.
  • A standard alloy (ADC12, A380, A360, Zamak 3, Zamak 5) instead of a special melt.
  • Finishing only where it is seen or specified, and export packing sized to the freight mode.
07 / What to send

What does an accurate quote need?

  • A controlled 3D model (STEP, IGES or X_T) and a 2D drawing with datums and tolerances.
  • Alloy or process preference, and the features that must be machined.
  • Annual quantity and order cadence, not only a one-off quantity.
  • Finishing requirement, destination country and target delivery date.
  • Any documentation the program needs: FAI, dimensional report, PPAP scope.

Send the drawing and the quotation comes back with the six lines separated, so the numbers can be checked instead of guessed. An engineer replies within 30 minutes, 09:00–21:00 CST.

Buyer questions

Cost questions that change the quotation

Price is a structure, not a single number.

Because a die casting is priced from the drawing, the alloy and the annual volume. A published number would be wrong for almost every part and right for none. The quotation separates tooling, material, casting, machining, finishing and freight so each line can be reviewed.

No. Cavity count, maintenance and cycle time decide that. A two-cavity tool costs more upfront and roughly halves machine time per part, which pays back at volume — and rarely pays back at a few thousand pieces a year.

Usually not. Compare landed cost including yield, rework, inspection and late delivery. A stable process at 97% yield can be cheaper per good part than a lower quote at 90% yield with repeated rejects.

Related pages

Continue through the project path.

Cost connects to the process choice, the drawing and the RFQ.

Send the drawing. Get the engineering questions first.

Include the material, annual quantity, finishing requirement, destination country and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.

Request a quote
Upload drawing