Project intake
Review drawing, quantity, material, finishing, inspection and delivery requirements.
The factory page should reduce remote sourcing risk through clear process, equipment and production evidence.
Shenzhen production base
The production path can include tooling, high-pressure die casting, CNC machining, finishing, assembly, inspection and packing depending on the part.
The factory is located in Shenzhen, China, was established in 2010 and covers 10,000 sqm with 200+ employees, including 15+ senior mold and process engineers.
Use this table for project planning, then confirm every critical value against the approved drawing and process plan.
| Location | Shenzhen, Guangdong, China |
|---|---|
| Established | 2010 |
| Primary process | Custom high-pressure die casting |
| Materials | Aluminum, zinc and magnesium |
| Factory area | 10,000 sqm |
| Employees | 200+, including 15+ senior engineers |
| Die casting machines | 20+ units: 8 x 160T, 6 x 280T, 4 x 500T, 2 x 800T |
| CNC and tooling | 30+ CNC units; 5 EDM and wire-cut units |
| Monthly capacity | 500,000+ pieces across three shifts |
Each stage produces a decision or document that the next stage depends on. This keeps engineering, purchasing and production aligned.
Review drawing, quantity, material, finishing, inspection and delivery requirements.
Assign the process route, machine, tooling, secondary operations and control points.
Run the approved process and record agreed inspection results.
Use the approved packing method and release the shipment documents.
A factory visit or video review focuses on the exact machines, production cells and inspection process that will support the project.
Remote buyers can review the production route, the inspection lab and the packing process with the project team before the first shipment.
These answers define the normal project path and the information needed for a useful quotation.
Provide the controlled 2D/3D drawing, material requirement, annual quantity, finishing requirement, critical dimensions, target market and delivery date.
An initial feasibility discussion is possible, but the quotation and tooling scope should be based on a controlled drawing revision.
Tolerance and inspection requirements are defined from the drawing, critical features, process capability and agreed datum strategy.
Ownership, storage, maintenance and transfer terms are defined in the quotation or supply agreement before the tooling project starts.
Use the internal links to connect the material, process, industry, product and RFQ pages around one project decision.
Include the material, annual quantity, finishing requirement, target market and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.