Contact / RFQ

Contact Chengdacai for a die casting project review

Send the drawing, material, quantity, finishing requirement and target delivery date. Include the target market and any NDA requirement.

Contact Chengdacai Contact Chengdacai
Contact
Summer
Email
summer@chengdacai.com
Phone
+86 137 1519 5783
Location
Shenzhen, Guangdong, China
Contact

Talk to the project team.

For the fastest review, include a controlled drawing and a short project summary.

summer@chengdacai.com+86 137 1519 5783Shenzhen, Guangdong, ChinaWhatsApp: +86 137 1519 5783

What to send

  • 2D and 3D drawing files
  • Material and finish requirement
  • Estimated annual quantity
  • Critical dimensions or functional requirements
  • Target delivery date and destination market
  • NDA requirement, if any

What happens next

Engineering reviews the drawing, identifies missing information and prepares the project questions needed for a useful quotation.

Open RFQ form
Buyer questions

Questions to resolve before production.

These answers define the normal project path and the information needed for a useful quotation.

Provide the controlled 2D/3D drawing, material requirement, annual quantity, finishing requirement, critical dimensions, target market and delivery date.

An initial feasibility discussion is possible, but the quotation and tooling scope should be based on a controlled drawing revision.

Tolerance and inspection requirements are defined from the drawing, critical features, process capability and agreed datum strategy.

Ownership, storage, maintenance and transfer terms are defined in the quotation or supply agreement before the tooling project starts.

Related pages

Continue through the project path.

Use the internal links to connect the material, process, industry, product and RFQ pages around one project decision.

Send the drawing. Get the engineering questions first.

Include the material, annual quantity, finishing requirement, target market and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.

Start an RFQ
Upload drawing