CNC machining for critical features after die casting

CNC machining after die casting starts at plus or minus 0.05 mm and finishes at plus or minus 0.01 mm: the second operation is where bore centers, gasket faces and threads are actually decided. This page covers the route, the fixtures and what the CMM proves.

Machined die cast housing on a CNC fixture Housing after machining, ready for assembly
±0.01 mm
Machined bore and face tolerance
30+
CNC machines in the plant
0.3–0.5 mm
Stock left per machined face
5 faces
Machined in one program when the fixture allows
01 / What machining decides

The die makes the shape, CNC machining makes the fit

A buyer comparing two quotations for the same housing is usually comparing two machining plans. The casting may be identical in alloy and wall, but the number of setups, the fixtures, the features approached in one clamping and the way the datum is established all change the price and the capability. A part machined in two setups accumulates the error of the second setup; a part machined in one holds bore-to-bore position from a single reference.

The machining plan also decides what the casting has to provide. If the fixture locates on as-cast pads, those pads have to be flat and consistent shot to shot, which is a die requirement. If the part is located from a cast bore, that bore has to be molded with enough accuracy to leave stock everywhere. The DFM review settles this before the die is cut, because a fixture designed afterwards costs more than a pad added to the die.

  • Bearing bores: roundness and size, usually fine boring after a rough pass
  • Gasket and sealing faces: flatness and surface finish, verified on the CMM or a surface plate
  • Threaded ports: drill, tap or thread mill, then a go/no-go gauge on every part
  • Mounting faces and bolt patterns: position from the datum, not from the nearest edge
  • Weight and balance: material removed is a cost line, so stock is kept to what the tolerance needs
02 / Feature capability

What the machine can hold, feature by feature

The numbers below are the tolerances quoted on production drawings, not the positioning accuracy of the machine tool. A feature outside this table is quoted as a special process.

FeatureAchievable toleranceTypical methodWhat it depends on
Bearing bore diameter±0.01 mmRough bore, then finish bore with a boring headRigidity of the setup and thermal stability
Bore position±0.03 mmOne setup from the machined datum faceFixture repeatability; second setup roughly doubles the error
Flatness on a gasket face0.02–0.05 mm over 100 mmFace mill with a supported partClamping distortion and casting flatness
Parallelism between bores0.02 mmBores machined in the same setupSpindle alignment and fixture wear
Perpendicularity to a face0.02 mmFace and bore in one clampingWhether the face is the true datum
Thread6H, go / no-goTap for through holes, thread mill for large or interrupted threadsHole size before tapping and coating build-up
Surface finishRa 1.6 µm typical, Ra 0.8 on requestFinishing pass, correct insert radius and feedTool condition and coolant
Hole position in a pattern±0.05 mmDrilled in one setup with a plate fixtureFixture plate accuracy, not machine accuracy alone
Tolerances apply to machined features measured at 20 °C on the CMM. Coating thickness is added after machining and has to be allowed for on threads, bores and fits.
03 / Route and setups

A typical route for a housing

The route below is the one used for a machined aluminum housing with two bearing bores, a gasket face and threaded ports. It is quoted as a sequence, because the sequence is the cost.

OperationMachineWhat it establishesTypical cycle
OP10 face and bore side A3-axis VMC with a dedicated fixtureDatum face, first bore, location for the second setup2–6 min
OP20 face and bore side B3-axis VMC, located from OP10 featuresSecond bore, parallelism across the part2–6 min
OP30 drill and tapVMC or 4-axis with a plate fixturePort threads, bolt holes and sensor holes2–8 min
OP40 deburr and washManual station plus aqueous washerNo loose chips entering the assembly1–3 min
OP50 inspectCMM and gaugesBore size, position, flatness, threadsSampled or 100% by drawing
OP60 finish and packCoating line, then packCorrosion protection and damage-free deliveryBy finishing lead time
Cycle times are typical for the part class and are confirmed at the quotation. Adding a fourth setup or a second fixture usually costs more than adding a feature.
04 / Equipment

Machines and metrology behind the route

EquipmentSpecificationRole
Vertical machining centers3-axis, 850 and 1160 mm tables, 8,000–12,000 rpm spindlesFaces, bores, drilling and tapping on most parts
4-axis machinesRotary table or trunnionMulti-face parts in fewer setups
Positioning accuracy±0.005 mm, repeatable to ±0.003 mmWhat the machine contributes before fixture error
FixturesDedicated cast-iron or aluminum plate fixturesRepeatable location; the fixture is the real tolerance holder
Tool presetterOffline setting with tool length and diameterFewer offsets, fewer scrapped first parts
CMM2 units at 0.001 mm resolutionFirst article and per-lot verification
Surface roughness testerRa measurement on machined facesConfirms the finish the drawing calls for
The plant runs 30+ CNC machines. Capacity is scheduled per program, so the quotation states the machining lead time rather than a plant average.
05 / Inspection

What is measured after machining

CharacteristicMethodFrequency
Bore size and roundnessCMM, or bore gauge for 100% checksFirst article, then per lot or 100% by drawing
Bore position and parallelismCMMFirst article and per lot
Gasket face flatnessCMM scan or surface plate and indicatorEvery lot on sealing parts
ThreadsGo / no-go gauge100% of threaded features
Surface finishRoughness tester on a sample faceFirst article and periodic
Burns and chipsVisual and air-blow check after washingEvery part before packing
Coating thickness on machined facesEddy-current gauge after finishingPer lot
Machining inspection is reported on the same dimensional report as the casting, so the buyer sees one document per lot rather than two.
06 / Cost drivers

Five decisions that move the machining price

Machining is priced from the features, the setups and the fixtures, not from the weight of the part. A housing with four machined faces and one bore is cheaper than a housing with two faces and eight bores, even if the second is lighter, because each bore adds a tool, a check and often a second setup.

The cheapest change a buyer can make is usually to loosen a tolerance that no one needs, or to allow a feature to stay as-cast. The most expensive is to add a feature after the fixture is designed, because the fixture, the program and the inspection plan all change with it. Before a tool exists, prototype options compares the soft-tool and machined routes on the same trade-off.

  • Number of setups: one is cheaper than two, and more accurate on position
  • Fixture cost: a dedicated fixture is a one-off cost that pays back over the program
  • Tolerance class: moving from plus or minus 0.05 to plus or minus 0.01 mm adds a finishing pass
  • Stock allowance: 0.3-0.5 mm is enough; more stock means more passes and more tool wear
  • Coating build-up: threads and bores need masking or an allowance, both of which are operations
Buyer questions

Machining questions that change the quotation

Tolerance, stock and setups decide the machining line, so they are answered before the fixture is designed.

Plus or minus 0.01 mm on a bore diameter and about plus or minus 0.03 mm on bore position from a single setup. Flatness on a gasket face is 0.02-0.05 mm over 100 mm depending on clamping and casting flatness. Anything tighter needs a different process, and the quotation says so rather than accepting the drawing and failing at first article.

0.3-0.5 mm per machined face is the standard allowance. Less risks cutting into the as-cast skin and opening subsurface porosity; more adds a roughing pass, tool wear and cycle time without improving the result.

As few as the geometry allows. A two-sided housing is normally OP10 and OP20, each locating on features made in the previous operation, and bore parallelism is then a function of the fixture rather than of the machine. Parts that need four or five faces use a 4-axis machine to keep the number of setups down.

Cut before coating and mask the thread, or cut after coating on a masked area. Coating adds roughly 0.05-0.1 mm per side, which is enough to stop a 6H gauge entering the thread. The drawing should say whether the thread is masked or cut after finishing.

A dimensional report per lot, generated from the CMM program written for the drawing, plus go/no-go gauges on every thread and a visual check for burrs and chips after washing. Where a feature is 100% gauged, the gauge result is recorded with the lot.

Related pages

Continue through the project path.

Material, process, quality and quotation pages that belong to the same decision.

Send the drawing with the tolerance class marked.

Include which faces and bores are machined, the datum, and the annual volume. The setups, fixture cost and inspection plan come back with the quotation.

Start an RFQ
Upload drawing