Datum review
Define casting datums, machining datums and inspection datums.
Secondary machining turns a cast shape into an assembly-ready part by controlling bores, faces, threads, seals and reference features.
CNC Machining project review
Die casting creates the part geometry. CNC machining controls the features that cannot be achieved reliably by casting alone, including bearing bores, sealing faces, threaded holes and tight interfaces.
The machining plan should be defined with the casting drawing. Datum strategy, stock allowance, workholding, tool access and inspection method need to agree with the casting process.
Use this table for project planning, then confirm every critical value against the approved drawing and process plan.
| Operations | Milling, drilling, tapping, reaming, boring and turning |
|---|---|
| Machining equipment | 30+ CNC units: 20 machining centers and 10 CNC lathes |
| Machine types | 3-axis and 4-axis machining centers; CNC turning by project |
| Tolerance | ±0.05 mm as cast; ±0.01 mm on machined features |
| Workholding | Fixture concept defined with casting datums and stock allowance |
| Inspection | Dimensional report and functional checks defined before production |
Each stage produces a decision or document that the next stage depends on. This keeps engineering, purchasing and production aligned.
Define casting datums, machining datums and inspection datums.
Confirm casting allowance, fixture access and first-operation stability.
Select machines, tools, fixtures and inspection frequency.
Approve first article and control the approved process through production.
These answers define the normal project path and the information needed for a useful quotation.
Provide the controlled 2D/3D drawing, material requirement, annual quantity, finishing requirement, critical dimensions, target market and delivery date.
An initial feasibility discussion is possible, but the quotation and tooling scope should be based on a controlled drawing revision.
Tolerance and inspection requirements are defined from the drawing, critical features, process capability and agreed datum strategy.
Ownership, storage, maintenance and transfer terms are defined in the quotation or supply agreement before the tooling project starts.
Use the internal links to connect the material, process, industry, product and RFQ pages around one project decision.
Include the material, annual quantity, finishing requirement, target market and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.