At the Shenzhen partner plant: two CMM units at 0.001 mm, one X-ray unit for internal porosity and one spectrometer for alloy verification, plus standard gauges for threads and fits. Which feature is checked, how often and against what tolerance still comes from the approved drawing and the control plan.
The project inspection plan should start from the drawing and customer requirements. Critical dimensions, material condition, appearance, sealing or functional features determine the inspection method and frequency.
- Incoming material and supplier records
- Drawing and change control
- First-article and in-process checks
- Dimensional, visual, material and functional verification
- Outgoing checks and release documentation