Quality / Inspection and Release

Quality control built around drawing risk and production evidence

A quality claim becomes useful when the inspection stage, method, record and reaction plan are defined for the actual part.

Die cast and machined part prepared for dimensional inspection Inspection and release control
IQC
Incoming control
IPQC
Process control
FQC
Final verification
OQC
Release check

In one sentence

Metrology at the Shenzhen partner plant: two CMM units at 0.001 mm, one X-ray unit for internal porosity and one spectrometer for alloy verification — and a dimensional report leaves with every production lot.

01 / Workflow

Quality control from incoming material to release

The project inspection plan should start from the drawing and customer requirements. Critical dimensions, material condition, appearance, sealing or functional features determine the inspection method and frequency.

  • Incoming material and supplier records
  • Drawing and change control
  • First-article and in-process checks
  • Dimensional, visual, material and functional verification
  • Outgoing checks and release documentation
Technical profile

Quality planning profile

EquipmentWhat it verifiesRecord it produces
2 × CMM, 0.001 mmCritical dimensions, GD&T and datum alignmentDimensional report for the lot; FAI report on request
1 × X-rayInternal porosity, cold shuts and shrinkage voidsImage set attached to the inspection report
1 × spectrometerAlloy grade against the drawingMaterial verification note, matched to the mill certificate
Standard gaugesThreads, flatness and functional fitsControl-plan inspection record
PPAP / FAIDocumentation scoped by the programFull PPAP or FAI package when the quotation says so
SamplingCoverage per control plan, 100% on agreed critical featuresPer-lot inspection results released with the parts
Inspection method and frequency follow the approved drawing and control plan for each program. Where the part is pressure-tight, the sealing test is a pressure decay check against the limit agreed on the drawing: the method, the units and the fixture are set out in pressure decay testing for die castings.
02 / Documents

Release documents are defined by the project

Typical controllable documents can include dimensional reports, material records, inspection records, first-article documents and project-specific PPAP files.

The quotation or quality agreement should state exactly which documents will be supplied, at which stage and for which lot.

  • Drawing revision and change record
  • Material and batch traceability
  • Dimensional and visual results
  • Functional or sealing test record
  • Packaging and shipment release
03 / Evidence

Documents that travel with the parts

Inspection records are produced against the approved drawing, so the buyer receives dimension data, material records and release documents for the agreed scope.

Calibration records and sample inspection reports are shared with the project team on request.

04 / Documentation

PPAP and inspection documentation

What a buyer can review depends on the part, not on a logo: the drawing, the inspection plan, the records produced against it, and the release documents for each shipment.

Inspection equipment includes two CMM units with 0.001 mm accuracy, an X-ray unit for internal defect review and a spectrometer for material verification. These support dimensional reports, porosity checks and alloy confirmation against the material certificate.

PPAP and first-article inspection (FAI) documentation can be scoped for automotive and structured programs. The quotation states which documents are supplied, at which stage and for which lot, so the release package is agreed before production rather than after.

Typical documents that travel with the parts include dimensional reports, material and batch traceability records, inspection results, functional or sealing test records and the packaging release.

Buyer questions

Quality questions that change the quotation

Inspection scope and acceptance rules are quoted as part of the part, not added later.

At the Shenzhen partner plant: two CMM units at 0.001 mm, one X-ray unit for internal porosity and one spectrometer for alloy verification, plus standard gauges for threads and fits. Which feature is checked, how often and against what tolerance still comes from the approved drawing and the control plan.

Each critical feature has a method, a frequency and a record: CMM dimensional reports, X-ray images for internal sections and spectrometer readings for alloy confirmation. The records for a lot are released with it.

Related pages

Continue through the project path.

Use the internal links to connect the material, process, industry, product and RFQ pages around one project decision.

Send the drawing. Get the engineering questions first.

Include the material, annual quantity, finishing requirement, target market and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.

Start an RFQ
Upload drawing