The factory operates an ISO 9001 and IATF 16949 quality system. Current certificates and their scope are shared on request.
The project inspection plan should start from the drawing and customer requirements. Critical dimensions, material condition, appearance, sealing or functional features determine the inspection method and frequency.
- Incoming material and supplier records
- Drawing and change control
- First-article and in-process checks
- Dimensional, visual, material and functional verification
- Outgoing checks and release documentation