Capability / Assembly and Testing

Assembly, sealing and testing for finished component delivery

Sub-assembly can simplify the supply chain when insert installation, sealing, testing and packaging are planned with the casting and machining process.

Assembly and Testing project review Assembly and Testing project review
Founded 2010
Shenzhen manufacturing base
Al / Zn / Mg
Material project planning
DFM first
Drawing review before tooling
One project path
Casting to finished parts
01 / Capability

Assembly and Testing in project context

Some die-cast projects end at the casting. Others require inserts, seals, hardware, subcomponents, functional checks and export packaging.

Assembly work should be defined by a bill of materials, work instruction, torque or fit requirement, inspection plan and traceability rule. Critical safety or regulatory functions require separate qualification.

  • Outdoor power equipment
  • Telecom and network enclosures
  • LED fixtures
  • Camera housings
  • Industrial controls
Technical profile

Assembly and Testing planning data

Use this table for project planning, then confirm every critical value against the approved drawing and process plan.

Assembly optionsInsert installation, riveting, sealing, fastening and sub-assembly
Testing optionsLeak testing, function checks and agreed inspection steps
DocumentationWork instruction, bill of materials and inspection record by project
PackagingPE bag, bubble wrap, foam, carton and pallet as specified
TraceabilityBatch and component records by agreed scope
Regulatory scopeDefined by the project's qualification and market requirements
Figures reflect current factory equipment and capacity. Final tolerances, cycle time and lead times are confirmed against the drawing in the quotation.
Project flow

How a assembly and testing project moves forward

Each stage produces a decision or document that the next stage depends on. This keeps engineering, purchasing and production aligned.

01

Scope definition

Confirm all components, work steps and acceptance criteria.

02

Pilot build

Validate fixtures, instructions, torque, sealing and test method.

03

Production

Control components, process settings and inspection records.

04

Pack and ship

Use the approved packaging and identification method.

Buyer questions

Questions to resolve before production.

These answers define the normal project path and the information needed for a useful quotation.

Provide the controlled 2D/3D drawing, material requirement, annual quantity, finishing requirement, critical dimensions, target market and delivery date.

An initial feasibility discussion is possible, but the quotation and tooling scope should be based on a controlled drawing revision.

Tolerance and inspection requirements are defined from the drawing, critical features, process capability and agreed datum strategy.

Ownership, storage, maintenance and transfer terms are defined in the quotation or supply agreement before the tooling project starts.

Related pages

Continue through the project path.

Use the internal links to connect the material, process, industry, product and RFQ pages around one project decision.

Send the drawing. Get the engineering questions first.

Include the material, annual quantity, finishing requirement, target market and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.