Capability / Assembly and testing

Assembly, sealing and testing for finished component delivery

Assembly and testing begin where a casting leaves the plant as a sub-assembly, and that carries a different risk: an insert that pulls out, a gasket that weeps, a connector that will not seat. This page sets out the assembly scope, the leak-test methods and the records that come with the box.

Assembled die cast enclosure with gasket and hardware Enclosure assembled and sealed before packing
IP54–IP67
Sealing designs quoted to the drawing
100%
Leak test on pressure-tight parts
0.5–2 bar
Air decay test pressure range
Per lot
Torque, force and test records
01 / What a finished part means

Scope is agreed before the first unit is built

Buyers use the word assembly for very different scopes. For one program it means pressing four threaded inserts into a housing. For another it means fitting a gasket, a PCB carrier, two connectors and a lid, then pressure testing the closed unit and labelling it with a serial number. Both are legitimate; the quotation is only comparable when the scope is written down.

The scope statement lists each operation, the control applied to it, the record kept, and which party supplies the component. Once that list is agreed, the assembly price is a sum of operations rather than a percentage, and a change can be priced without re-quoting the whole program.

  • Insert installation by press force and depth, or by thermal insertion where the plastic or the wall requires it
  • Fastening to a torque and, where specified, a torque-plus-angle value
  • Gasket and seal placement with a visual and gap check before closing
  • Connector and terminal seating by go/no-go gauge
  • Functional test to the customer test specification, with pass/fail recorded
  • Serial labelling, packaging and, on request, a shipping audit record
02 / Assembly scope

Each operation has a control and a record

The table is the scope statement used for an enclosure program. It is filled in with the customer before the first production lot, and the finished-part drawing is attached to it.

OperationControlRecord
Insert installationPress force window and insertion depth, monitored per unitForce and depth logged; sample pull test per lot
Screw fasteningTorque driver set to the drawing value, with angle monitoring on critical jointsTorque value and driver ID per lot
Gasket placementSeat position and compression gap before closingVisual check per unit; gap measured on the sample
Connector seatingGo / no-go gauge after fittingGauge result per unit
Functional testTest fixture per the customer specificationPass / fail with failure code
Serial markingLaser or label per the agreed formatSerial range recorded against the lot
PackagingInsert, dividers and carton grade per the packaging instructionCarton count and weight per shipment
Operations that are not on the agreed list are not performed silently. If a unit needs rework outside the list, it is quarantined and the customer is told before it ships.
03 / Leak and pressure test

Four methods, four different answers

A leak specification has to name the method, because a part that passes a 30-second air decay test is not the same as a part that passes helium. The method is chosen from the leak rate the application can tolerate.

MethodMedium and settingDetectsUsed when
Air decayAir at 0.5–2 bar, 10–30 s hold, pressure drop against a calibrated limitGross leaks and most sealing-face defects on castingsDefault for IP-rated enclosures and housings
Pressure decay with a reference volumeSame as above, differential against a known-good volumeSmaller leaks than a simple decay test, insensitive to temperature driftProduction testing where ambient temperature varies
Helium leak testHelium tracer, mass spectrometer, down to about 1×10-6 mbar·L/sVery small leaks, pinholes and porosity through a wallSealed electronics, battery housings, medical-adjacent work
Hydrostatic testWater at 1.5× the working pressure, hold per specificationStructural failure and leaks under pressurePump and valve bodies, pressure vessels within the applicable code
IP verificationDust and water test per IEC 60529, at the stated IP levelIngress protection of the assembled unitOnly where the drawing claims an IP rating and a type test is required
An IP rating is a claim about a tested assembly, not about a gasket drawing. Where the drawing states an IP level, the test method and sample size are agreed before the first lot.
04 / Equipment

Test and assembly equipment

EquipmentSpecificationRole
Leak test instrumentsPressure decay and differential decay, programmable limits100% testing on pressure-tight parts
Helium leak detectorMass spectrometer with a vacuum chamberFine leak limits on sealed units
Torque driversTransducer-controlled, with angle monitoringFastening to the drawing value
Press with force monitoringForce and distance curve per cycleInsert installation and bearing pressing
Functional test fixturesBuilt to the customer test specificationEnd-of-line pass / fail with failure codes
CMM and X-ray0.001 mm CMM, in-house X-rayIncoming check on castings before assembly
Salt spray chamberPer the finishing specificationCoating durability on assembled parts
Fixtures and test benches are program-specific. They are quoted as a one-off, and they stay with the program rather than being charged again at each order.
05 / Inspection

What is checked on the finished unit

CharacteristicMethodFrequency
Insert pull-out strengthPull test to the drawing valueFirst article and per-lot sample
Insert depth and positionDepth gauge or CMM on the sampleFirst article, then visual on 100%
Fastener torqueTransducer reading100% on critical joints, sample elsewhere
Leak rateAir decay or helium per the specification100% on pressure-tight parts
Functional performanceTest fixture per the customer specification100%
IP ratingType test per IEC 60529 at the stated levelDesign validation and periodic re-test
CosmeticVisual against the approved sampleEvery unit
Packaging and labellingCheck against the packaging instructionEvery carton
Test data is recorded against the lot number. When a customer audits a shipment, the record shows which unit was tested, with which instrument and against which limit.
06 / Designing for assembly

What the casting has to give the assembly

Most assembly problems are casting problems that appear late. An insert boss that is too thin splits when the insert is pressed. A gasket groove that is too shallow leaks no matter how much torque is applied. A connector cut-out that is half a millimetre off will not let the connector seat, and the operator discovers it at the end of the line.

The fix is to design the assembly features into the DFM review: boss wall thickness around an insert, groove depth and width against the gasket section, flatness on the sealing land, clearance around a connector, and access for the driver or the press tool. Each of those is a die feature, so each is cheap before the die is cut and expensive afterwards.

  • Insert bosses: wall at least the insert diameter around the hole, with a fillet at the base
  • Gasket grooves: depth and width matched to the gasket section, flat land either side
  • Sealing faces: flatness specified and measured, not assumed from the casting
  • Connector openings: clearance for the connector body and the latch, not just the pin pattern
  • Tool access: room for the driver, the press ram and the test probe
  • Orientation: a feature that only fits one way prevents assembly errors at the line
Buyer questions

Assembly questions that change the quotation

Scope, test method and records are agreed before the first unit, not after the first complaint.

Insert installation, fastening, gasket and seal fitting, sub-assembly, functional testing, serial labelling and packaging, all defined by a scope statement agreed before the first lot. Operations outside that list are quoted separately rather than absorbed silently.

By method, medium, pressure, hold time, allowed leak rate and the surfaces that must remain sealed. Where the part separates coolant, oil or air from electronics, testing is normally 100% on the agreed critical features. A leak limit without a method is not a specification.

Yes, where the drawing states the IP level and the test is part of the program. The IP claim belongs to the assembled unit, so the test is done on the assembly with the specified gasket and hardware, not on the bare casting. The method follows IEC 60529 and the sample size is agreed before the first lot.

Either party, but it is written in the scope statement. When the customer supplies components, incoming inspection is limited to what can be seen and measured without damaging them, so a defective supplied batch is caught at the source rather than at the end of the line.

The dimensional report for the casting, the test record for each pressure-tested unit, torque and force data for the controlled joints, the functional test result, and the serial range against the lot. The records are kept for the period agreed in the supply terms.

Related pages

Continue through the project path.

Material, process, quality and quotation pages that belong to the same decision.

Send the drawing and the assembly scope.

Include the test specification, the components you supply and the records you need. The assembly operations, fixtures and test plan come back with the quotation.

Start an RFQ
Upload drawing