Logistics / Shipping Terms

FOB, CIF or DDP: what your die casting quote actually includes

Ask about delivery and Incoterms, and most suppliers will answer that they ship worldwide. The term that changes your landed cost is the one that names who clears customs, who is importer of record, and what the price already covers.

Die cast part prepared for export packing Export packing and terms
Default term
FOB Shenzhen
Rules
Incoterms 2020
DDP
Quoted per shipment
Records
With every lot

In one sentence

Default term: FOB Shenzhen under Incoterms 2020; DDP to Europe is quoted per shipment with the named place, duty treatment, VAT treatment and validity written into the offer — never as a rate card.

01 / Default terms

What we quote unless you ask otherwise

Freight is not folded into the piece price. The quotation shows the part price at the agreed term and keeps the freight visible as its own line, so a later freight change does not look like a price increase on the casting.

  • FOB Shenzhen under Incoterms 2020 is the default: the buyer nominates the forwarder and books after the delivery date is confirmed.
  • EXW on request, when the buyer already runs a China-based forwarder.
  • CIF only when asked, with the insurance clause named in the offer — Institute Cargo Clauses C unless cover A is requested.
  • Air (DHL or FedEx) for samples, T1 parts and tooling trials; duties usually on the buyer's account unless the offer says otherwise.
  • DDP is quoted per shipment, never as a standing rate. Section 03 explains why.
02 / Responsibility split

Incoterms: who pays for what under each term

Incoterms 2020. The importer of record is the party customs treats as the buyer, which drives duty, VAT and product compliance.

TermMain freight and insuranceExport clearanceImport clearance, duty and VAT
EXWBuyer, collected from the factoryBuyerBuyer
FOBBuyer, from the Shenzhen portSellerBuyer
CIFSeller, freight and insurance to the destination portSellerBuyer
DAPSeller, to the named placeSellerBuyer
DDPSeller, to the named placeSellerSeller, as written in the offer
Named place, insurance clause and who clears import must appear in the quotation. A term without a named place is not a term.
03 / DDP to Europe

What DDP actually requires

DDP is a customs position, not a delivery speed. The seller becomes importer of record, pays duty and — unless the offer says "DDP, VAT excluded" — pays import VAT at the destination rate. In this industry most DDP offers mean duty paid with VAT excluded, because a VAT-registered importer recovers the VAT anyway; the difference matters for cash flow, not for cost.

  • The buyer's EORI and VAT number are still needed even when the seller pays, because the goods must be cleared into someone's books.
  • Duty depends on HS code and origin, and anti-dumping or countervailing measures exist on some China-origin aluminum products. The rate is confirmed for the part and the shipment before a DDP figure is given.
  • CE marking and product compliance stay the importer's obligation unless a written agreement says otherwise. We supply material certificates and inspection records, not a declaration of conformity.
  • A DDP price without a validity date is not a price. Ocean freight and duty move; the offer carries the date it lapses.
04 / Documents

What travels with the shipment

The document set is agreed in the quotation, because it differs between a distributor and an OEM program.

DocumentWhat it carries
Commercial invoiceHS code, origin, Incoterm and named place, unit price and total
Packing listCarton count, pallet count, gross and net weight, dimensions
Bill of lading or air waybillIssued to the party named in the offer
Certificate of originIssued through the CCPIT when the destination customs or a preferential rate requires it
Material certificateAlloy heat and mill certificate matched to the lot
Inspection recordsDimensional report for the lot; X-ray images where the drawing specifies them
Wood packagingISPM-15 mark on every wooden pallet, treatment certificate on request
05 / Transit

How long the sea leg takes

Port-to-port from Shenzhen, the ranges below are the ones actually quoted; they change with congestion, blank sailings and routing, so a booking date always overrides them.

  • Northern Europe (Rotterdam, Hamburg, Antwerp): about 28–35 days port to port.
  • Mediterranean (Genoa, Valencia): about 25–32 days.
  • US West Coast: about 14–20 days.
  • Air: about 3–6 days door to door for samples and T1 approval parts.
  • Consolidation (LCL) saves cost per shipment but adds time at both ends; a full 20ft or 40HQ container is quoted once the volume justifies it.

Door delivery adds the inland leg and the customs slot. A DDP offer that shows only the sea freight is incomplete.

06 / Quoting DDP

What to send for a DDP figure

  • Delivery address with postcode, and the port if it is a port-to-door move.
  • Annual volume and shipment cadence — one container a quarter and one a week are different freight problems.
  • Whether the importer of record is your EU entity or the seller.
  • HS code if you already have one; otherwise the part description and end use.
  • Compliance requirements: CE marking, end-use restrictions, or a customer-specific document set.

Send the drawing and the delivery address and the offer comes back with the term, the named place and the validity stated.

Buyer questions

Shipping questions that change the landed cost

The term is agreed before the first booking, not after the first delay.

Yes, per shipment. Send the delivery address with postcode, the annual volume and shipment cadence, and whether the importer of record is your EU entity or ours. The quote then states the named place, the duty treatment, the VAT treatment and a validity date. No DDP rate card is published, because freight and duty both move.

Under DDP the seller is, which is why your EORI and VAT number are still needed to clear the goods and to recover VAT. If your EU entity should be importer of record, DAP is usually the cleaner term: you clear and recover VAT, we deliver to the named place.

Related pages

Continue through the project path.

Terms sit between the quotation and the shipment; these pages cover the parts either side.

Send the drawing. Get the engineering questions first.

Include the material, annual quantity, finishing requirement, destination country and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.

Request a quote
Upload drawing