Provide the controlled 2D/3D drawing, material requirement, annual quantity, finishing requirement, critical dimensions, target market and delivery date.
A practical DFM checklist for walls, draft, ribs, fillets, holes, bosses and machining allowance.
Use this guide as a preparation checklist before sending an RFQ. Final decisions should still be based on the controlled drawing, application requirement and project evidence.
- Wall thickness and transitions
- Draft and parting line
- Ribs and bosses
- Machining stock and datum strategy