Resources / How to Prepare a Die Casting RFQ

How to Prepare a Die Casting RFQ

Most quotations come back wrong because the RFQ was incomplete. A drawing, an annual volume, a finish and a test spec are the minimum; the rest is what turns a price into a decision.

How to prepare a die casting RFQ RFQ preparation review
Audience
Buyers and engineers
Focus
Practical decisions
Next
DFM review
Output
Actionable checklist

What a die casting RFQ has to tell the supplier

A die casting quote is a calculation over geometry, alloy, volume, finish and test. If any of those is missing, the supplier fills the gap with an assumption, and the assumption becomes the price. The job of your RFQ is to remove the assumptions.

Your minimum pack is: a 3D model, a 2D drawing with tolerances and finish, the annual and order volume, the alloy if known, the functional requirements, and the target date. Everything else is refinement.

  • 3D model in STEP or IGES, plus the native file if available
  • 2D drawing with the tolerance standard and critical callouts
  • Annual volume and order quantity
  • Alloy, finish and any test requirement
  • Required date and delivery terms

The drawing information that changes the price

Two drawings of the same part can be quoted 40% apart because one carries a general tolerance and the other carries a tight callout on a face that does not need it. Tolerances are the most expensive line on a drawing: every tight dimension adds inspection, fixturing and sometimes a machining operation.

The same is true of the finish and the leak test. A powder coat with a masking list is a different part from a coating note that leaves the threads to be coated. A 100% leak test is a different part from a sampled one.

InformationWhy it changes the price
General tolerance standardSets the inspection and process burden
Critical dimensionsDrives fixturing and machining
Alloy gradeMaterial cost and castability
Finish and maskingCoating cost and handling
Leak or pressure testTest time and reject rate
Annual volumeCavity count and amortisation

A drawing without a tolerance standard is not quotable: the supplier has to guess whether to price a machined part or an as-cast one.

Volume, tooling and the assumptions behind them

Volume decides the cavity count, and cavity count decides both the tool cost and the piece price. Ask the supplier to quote at two volumes if the forecast is uncertain — it exposes whether the tool is sized for the real program or for the first order.

Tooling ownership and amortisation should be explicit: is the tool a separate one-time charge, amortised into the piece price, or customer-owned? Each has a different cash flow and a different exit. If the program ends early, who keeps the tool?

  • Quote at two volumes if the forecast is uncertain
  • State whether the tool is separate, amortised or customer-owned
  • Agree the tool life assumption
  • Agree what happens if the volume halves

Functional requirements worth writing down

The drawing shows geometry; the RFQ should state function. A housing that holds oil has a different requirement from one that holds a PCB. A bracket that sees vibration has a different requirement from one that sees static load. Those sentences are what let the supplier propose a better design instead of quoting the one it was given.

It is also worth stating what the part must not do: must not leak at 1.5 bar, must not exceed 400 g, must not corrode in salt spray for 200 hours. Negative requirements are easier to design to than positive adjectives.

  • What the part does and what load or pressure it sees
  • Environment: indoor, outdoor, marine, washdown
  • Limits: mass, envelope, leak rate, corrosion hours
  • Assembly: what it mates with and how it is fixed

What to ask before accepting the quote

A quote is a starting point for a technical conversation. Before accepting, ask what alloy and yield the price assumes, what cavity count, what cycle time, what the tool life is and what the tolerance and finish assumptions are. A supplier that can answer those has quoted a real part; one that cannot has quoted a number.

Also ask for the DFM review before the tool is cut. It is the step that finds the draft problem, the slide that could be avoided and the tolerance that cannot be held, and it is cheaper than discovering them at T1.

  • Which alloy, yield and cycle time the price assumes
  • Cavity count and tool life
  • Tolerance and finish assumptions
  • DFM review before the tool is cut
  • Sample and approval process

Preparing an RFQ: where to go next

A complete RFQ is the cheapest way to get a comparable quote. Upload the model and the drawing with the volume and the functional requirements and the quote comes back with its assumptions stated.

Related pages

Continue through the project path.

Use the internal links to connect the material, process, industry, product and RFQ pages around one project decision.

Send the drawing. Get the engineering questions first.

Include the material, annual quantity, finishing requirement, target market and delivery date. The review can start from STEP, IGS, DWG, DXF, PDF or ZIP files.